Interface · Mining & Geotech
Level-Set Method for Mining & Geotech
Apply the level-set method to real mining & geotech problems — in the browser, with AI assistance.
Level-set methods represent an interface as the zero contour of a field, handling topology changes in multiphase flow and fronts.
In mining & geotech, teams face challenges like slope stability, groundwater, comminution. The level-set method directly supports use cases such as slope fea, groundwater flow, particle dem, and PolySim's AI Copilot can recommend settings and catch common setup errors before you run.
Typical Mining & Geotech use cases
- Slope FEA
- Groundwater flow
- Particle DEM
Upgrade your workspace
Hackathon / Team Sprint Pack — $35
A short-term team workspace with pooled compute for sprints.
Recommended products
arXiv / PubMed Literature Digest
$8A cited digest of recent literature on your topic.
Creator / Educator
$19/moShare classrooms, publish embeds, and teach with PolySim.
Featured Partner Placement
$99/moFeatured placement for hardware/cloud partners on guides.
High-Res Mesh Credit
$4Unlock a fine-mesh solve for higher spatial accuracy on one run.
Parameter Sweep (50 runs)
$12Run up to fifty parameter variations and compare results.
FEA / Structural Pro Pack
$39Structural, thermal, and modal finite-element analysis toolset.