Critical Path (CPM) for a staff roster
Simulate a staff roster live in your browser. This runs the real Critical Path (CPM) solver — adjust the inputs, watch it respond instantly, and export the result. No install, no account.
Controls
Presets
The Critical Path Method finds the longest chain of dependent tasks through a project — the sequence that sets the minimum completion time. Tasks on it have zero slack: delay any one and the whole project slips. Tasks off it can float. Stretch task B or D and watch the critical path re-route. The backbone of project management.
Data Inspector
Governing equation
Runs locally in your browser — free forever. Scale to the cloud when reality gets heavy.
About this simulation
The full Critical Path (CPM) tool models a staff roster with the same numerics engineers and scientists use — running entirely client-side. Change any parameter and the result updates in real time, so you can build intuition, check a design, or teach the concept without spreadsheets or installs.
More you can do with Critical Path (CPM)
Other ways to simulate a staff roster
Frequently asked questions
- How do I simulate a staff roster?
- Open this page and use the live Critical Path (CPM) tool below — set your inputs and the simulation runs instantly in your browser using real numerics. No install, no account needed.
- Is it free?
- Yes. The simulation runs free in your browser. A one-time unlock or a Pro plan adds advanced parameters, saved presets, data import, and clean exports.
- Can I use my own numbers?
- Absolutely — every input is adjustable, and with data import you can drive a staff roster from your own measurements.