PPolySim OS
Electronics & Power Pack · Multi-Solver

Substation Grounding

Fault current & safety. This multi-solver chains 1 solvers into a single guided workflow — run each step in order and carry the result forward.

Workflow steps
  1. three-phase
or unlock everything with Pro →
Three-Phase PowerLive

Controls

Presets

Three-phase power delivers energy on three conductors carrying sinusoids 120° apart, so total power is constant and motors self-start. Line and phase voltages differ by √3, and real power is P = √3·V_line·I·cosφ. The power factor cosφ measures how much current actually does useful work.

▶ Run in Python

Data Inspector

Phase voltage231 V
Real power P12.5 kW
Apparent S13.9 kVA
Reactive Q6.0 kVAR

Governing equation

Reading this result: Real power P = √3·V_line·I·cosφ = 12.5 kW, trailing the 13.9 kVA apparent power by the angle φ = 26°.

Runs locally in your browser — free forever. Scale to the cloud when reality gets heavy.

Need a private, branded version?

We build custom solvers and workflows for labs, firms, agencies, and courses — your parameters, your branding, your data.

Explore Custom Solver Sets →

More in the Electronics & Power pack

Frequently asked questions

What is the Substation Grounding multi-solver?
Substation Grounding is a guided workflow that chains 1 individual PolySim solvers into one end-to-end analysis, piping each result into the next step.
Is it free to use?
Yes. Every step runs entirely in your browser using real numerics — no install, no account, no cloud cost. Custom or private solver packs are available as a paid service.