PPolySim OS
Use case · powered by Critical Path (CPM)

Critical Path (CPM) for a pipeline layout

Simulate a pipeline layout live in your browser. This runs the real Critical Path (CPM) solver — adjust the inputs, watch it respond instantly, and export the result. No install, no account.

Critical Path MethodLive

Controls

Presets

The Critical Path Method finds the longest chain of dependent tasks through a project — the sequence that sets the minimum completion time. Tasks on it have zero slack: delay any one and the whole project slips. Tasks off it can float. Stretch task B or D and watch the critical path re-route. The backbone of project management.

▶ Run in Python

Data Inspector

Project duration15 days
Critical tasksA, B, D, F
Tasks6
Reading this result: The critical path is A → B → D → F at 15 days. Tasks C, E carry slack — delaying them will not move the finish date, but any slip on a critical task pushes the whole project.

Governing equation

Runs locally in your browser — free forever. Scale to the cloud when reality gets heavy.

or unlock everything with Pro →

About this simulation

The full Critical Path (CPM) tool models a pipeline layout with the same numerics engineers and scientists use — running entirely client-side. Change any parameter and the result updates in real time, so you can build intuition, check a design, or teach the concept without spreadsheets or installs.

More you can do with Critical Path (CPM)

Other ways to simulate a pipeline layout

Frequently asked questions

How do I simulate a pipeline layout?
Open this page and use the live Critical Path (CPM) tool below — set your inputs and the simulation runs instantly in your browser using real numerics. No install, no account needed.
Is it free?
Yes. The simulation runs free in your browser. A one-time unlock or a Pro plan adds advanced parameters, saved presets, data import, and clean exports.
Can I use my own numbers?
Absolutely — every input is adjustable, and with data import you can drive a pipeline layout from your own measurements.